Chinese turbine upright
|
Chinese turbine upsidedown
|
Chris surveying
|
Generator leveled and set in concrete
|
Generator operating
|
Intake in place
|
Jana, Laurel, Kellen (from Spring Street school) and Kre Khi village woman work together filling sandbags
|
Kre Khi children
|
Weir with cemented face. Temporary pipe for dryseason flow.
|
Kre Khi penstock and powerhouse roof
|
Villagers and spring street students after generator installation
|
Trenching headrace
|
Kre Khi weir under construction
|
Polchai and Steve glue first section of PVC pipe
|
Powerhouse enclosed, Kre Khi plant up and running!
|
Preparing discharge (old plastic bucket set in concrete)
|
|
Kre Khi villagers watching video powered by microhydro
|
Kre Khi children raising Thai flag before school
|
Kre Khi powerhouse
|
Turbine foundation before cement pour
|